City of Santa Clara, UT

Utah Utility Interconnection & net metering rules

Spot something wrong?

Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.

Report a correction
Net Metering AllowedYes
NEM TypeMonthly
Line Taps AllowedNo
Load Taps AllowedNo

Net metering & export

Net Metering Allowed
Yes
NEM Type
Monthly
TOU Utility
No
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

If the energy supplied by the City exceeds the electricity generated by the Customer and fed

back to the City during the billing period, or any portion thereof, then the customer shall be

billed for:

  1. i. The net energy supplied to Customer by the City’s electric distribution system;
  2. ii. The appropriate customer base charge paid by other customers of the City in the same rate class;
  3. iii. The monthly Solar Reliability Charge as described in Exhibit B.

If the energy generated by Customer and distributed back to the City’s electric distribution

system during the billing period, or any portion thereof, exceeds the energy supplied to the

Customer by the City’s electric distribution system, then the customer shall be:

  1. i. Billed for the appropriate customer service charge as other customers of the City in the same rate class;
  2. ii. Credit for the net excess kWh’s generated during the billing period at the Renewable Power Rate as described in Exhibit B, with this kWh credit appearing on Customer’s bill for the following billing period.
Rebates Offered
No

Interconnection & taps

Approval Req To Install
Yes
Line Taps Allowed
No
Load Taps Allowed
No
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
No

System size & offset

System Size Restrictions
8
System Size Restriction Type
AC kW
System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes


Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

SLD Reqs

For a 6000 Inverter please use a 40A 2P Breaker. There is a shortage of 35A Breakers - 11.23.20

Website
link
Phone
(435) 673-6712