Heber Light & Power
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Annual
- TOU Utility
- 0
- Post Solar Billing Method
- Net Metering
- Solar Export Type
- Fixed kWh
- Net Excess Generation Notes
The Company shall deduct from the Customer’s energy usage in kWh the Excess Energy produced by the Net Metering Facility and delivered to the Company’s system. The Customer shall not be entitled to any other credit or adjustment and shall pay all other charges associated with the Service provided to the Customer. In April of each year, the Company shall pay the Customer for any unused Excess Energy from the period since the last reconciliation computed at the Rate per kWh that the Company charges the Customer for retail Service at the Service Address. The Rate does not include energy or sales tax.
- Rebates Offered
- 0
- Deregulated
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 0
System size & offset
- System Size Restrictions
- 90
- System Size Restriction Type
- Percent
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
Has a generating capacity that does not exceed the lesser of:
- 25 kW
- 90% of the customer's average energy usage during the prior 2 years or the Company's estimate of the annual usage based on the size and type of Service
- the capacity limitations of the Company's system or the circuit to which the Net Metering Facility shall be attached
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- Yes
- Production Meter Position
- Inv-PM-Disco-POI
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
Production Meter shall be located not less than 5ft from the Service Meter.
the disconnection switch is accessible to the Company at all times, without assistance from the Customer or other non-Company personnel.
- SLD Reqs
Production Meter Required
Inverter -> PM -> ACD -> POI
- Install Reqs
Prior to designing the system, please check solar eligibility of the customer's address: https://www.heberpower.com/distributed-generation
- Click the search box and type in the address, the result will be the "Feeder Circuit Name"
- Scroll down and search for the "Feeder Circuit name", once you have found it, select it so you'll know if there's still capacity for solar
- If there's no capacity, project will not be able to move forward
- Label Page Notes
Reference Utah Labels block
- Rate Schedule Link
- link
- Website
- link
Other details
- Restrict Inspection
- 0
- Revision Required
- 0
- Mod Swap Requires Planset
- 0
- Address ID
- 247274
- Express Planset Eligible
- Yes