Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

Herber Light & Power

Utah Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeAnnual
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
1
NEM Type
Annual
TOU Utility
0
Post Solar Billing Method
Net Metering
Solar Export Type
Fixed kWh
Net Excess Generation Notes
The Company shall deduct from the Customer’s energy usage in kWh the Excess Energy produced by the Net Metering Facility and delivered to the Company’s system. The Customer shall not be entitled to any other credit or adjustment and shall pay all other charges associated with the Service provided to the Customer. In April of each year, the Company shall pay the Customer for any unused Excess Energy from the period since the last reconciliation computed at the Rate per kWh that the Company charges the Customer for retail Service at the Service Address. The Rate does not include energy or sales tax.
Rebates Offered
0
Deregulated
0

Interconnection & taps

Approval Req To Install
Yes
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
0

System size & offset

System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes
"Net Metering Service is limited to Net Metering Facilities: (1) that generate Renewable Energy, (2) that have a total capacity of 25 kW or less and (3) that do not exceed system or circuit capacity limitations or 90% of the Customer’s average load."
Offset Calc Tool
Historical Usage

Plans & docs

Site Plan Reqs
In addition to the Service Meter, a Net Metering Service shall have a Production Meter installed and owned by the Company. The Customer shall provide the Meter Base for the Production Meter, which shall be located not less than five feet from the Service Meter. "
SLD Reqs
Inverter -> PM -> ACD -> POI
Rate Schedule Link
link
Website
link

Other details

Address ID
248723
Express Planset Eligible
Unknown
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Herber Light & Power before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.