Hyrum City Electric Department

Utah Utility Interconnection & net metering rules
Net Metering Allowed0
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
0
TOU Utility
0
Post Solar Billing Method
Feed-in-Tariff
Solar Export Type
Fixed kWh
Solar Export Rate
0.04
Net Excess Generation Notes

Purchase all energy produced at $0.04/kWh

Rebates Offered
0
Deregulated
0

Interconnection & taps

Approval Req To Install
No
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
0

System size & offset

System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

Residential: 10 kW

Commercial: 50 kW

Offset Calc Tool
N/A

Metering & disconnect

Production Meter Required
Yes
Production Meter Position
Inv-Disco-PM-Disco-POI
AC Disconnect Required
Yes
Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs

Site plans showing the physical layout of the Generating Facility and the location of associated structures and infrastructures such as buildings, streets, driveways, water ways, fences, the customer generating equipment and the City's associated distribution system equipment.

SLD Reqs

A single-line and three-line drawing showing the electrical relationship and descriptions of the significant electrical components such as the primary switchgear, secondary switchboard, protective relays, transformers, generator, circuit breakers, with operating voltages, capacities, and protective functions of the Generating Facility, the customers load, and the interconnection with the City's distribution system which is typically the City's transformer

For a 6000 Inverter please use a 40A 2P Breaker. There is a shortage of 35A Breakers - 11.23.20

A dedicated PV system production meter between the inverter and customer-provided AC disconnect switch is required

Install Reqs

Each GF installation must include a manually operated, lockable, disconnect switch with a visual break. The disconnect switch must be visible and accessible at all times by Hyrum City Electric Department. personnel to allow the GF to ben disconnected safely during maintenance or outage conditions. In the case of a PV system, this disconnect switch must be located next to the Hyrum City Electric Department electric meter. Thedisconnect switch shall be permanently labeled with text indicating that the switch is for the GF. The labeling shall also clearly indicate the open and closed position of the switch. The disconnect switch must be located on the output or load side of the GF such that the entire GF can be isolated from Hyrum City Electric Department distribution system. If the site contains several generators, a single disconnect switch may be used providing its rating is sufficient for all generators and opening it produces a visible open point between all generators and the Hyrum City Electric Department system.

Meter Num Req SLD 3LD
0
ESID Num Req SLD 3LD
0
Website
link
Phone
(435) 245-6033

Other details

Restrict Inspection
0
Revision Required
0
Mod Swap Requires Planset
0
Address ID
142152
Express Planset Eligible
No