Lehi City Power Department
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Monthly
- TOU Utility
- 0
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
The customer shall receive a credit for all electric energy produced by the customer on the premises which is fed back into the city’s electric distribution system during a billing period in excess of the amount of electric energy supplied by the city during that billing period, with such credit applied to the customer’s future Electric bills, except that any electric energy credit balance remaining in favor of the customer at the time of their March billing each year shall be zeroed out with no further liability to the city and no credit to the customer for said balance.
- Rebates Offered
- 0
- Deregulated
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 10
- System Size Restriction Type
- DC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
NEM is restricted to 10kW DC
- Offset Calc Tool
- N/A
Metering & disconnect
- Production Meter Required
- Yes
- Production Meter Position
- Inv-PM-Disco-POI
- Production Meter Labeling
- Production Meter
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
Site Plan is not required to be submitted - no specific information required.
- SLD Reqs
Electrical Service Panel
Include the panel or main breaker size and the position at which generation is connected.
Show all panels (if there are multiple panels or subpanels) Even if they are not directly connected into the generation system.
Utility Service Meter
Include existing meter serial number, meter form and class
PV system Output Meter Base (Production Meter)
Must be located within 5' of Utility Service Meter.
For a 6000 Inverter please use a 40A 2P Breaker. There is a shortage of 35A Breakers - 11.23.20
- Electric Service Reqs
Stand-alone meters must receive an MPU in Utah
AC Disconnect
The customer shall be required to install a manual disconnect located within ten (10) feet of the meter.
UL-approved safety disconnect switch which shall be capable of fully disconnecting the Customer’s generating facility from the Lehi City Power’s electric system.
The disconnect switch shall be located adjacent to the Lehi City Power’s meters and shall be of the visible break type in a metal enclosure which can be secured by a padlock.
The disconnect switch shall be accessible to Lehi City Power personnel at all times.
Production Meter
Customer shall furnish and install the Generating Output Meter base within 5 feet of the Meter
This meter shall be Electrically Located in order to record all power produced by the renewable system.
- Placards
Meter or Transformer Pole:
Meter and transformer or transformer pole serving the Customer-Generator shall be labeled to indicate potential electric current back feed.
Service Panel
Customer’s over-current device at the service panel shall be marked to indicate power source and connection to the Lehi City Power’s distribution system.
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Label Page Notes
Reference Utah Labels block
- Website
- link
- Phone
- (385) 201-1040
Other details
- Restrict Inspection
- 0
- Revision Required
- 1
- Mod Swap Requires Planset
- 1
- Address ID
- 108118
- Express Planset Eligible
- No