LL&P - Logan Light & Power

Utah Utility Interconnection & net metering rules
Net Metering Allowed1
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
1
Rebates Offered
0

Interconnection & taps

Approval Req To Install
Yes
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
Offset Calc Tool
N/A

Plans & docs

Site Plan Reqs
All datasheets for the proposed equipment (solar panels, inverters, cable, etc...) must be included in the application as well as a structural load design and letter from a structural engineer licensed in the State of Utah.
SLD Reqs
This document must indicate the location of the solar electric modules, inverter, batteries (if any), lockable disconnect switch, and point of connection with the utility system. All electrical equipment specifications and calculations must be shown on the one-line. Any signs/labels should be shown with their respective calculated values on the one-line. The installation address, current account number at that address, and the installer's name and telephone number must also be included.
Install Reqs
Utility- Accessible AC Disconnect Switch Location (should be within sight and within 3 feet of bidirectional meter when possible all other locations must be approved by Logan City Light &Power) The Production meter shall be located on the exterior of the building within 10 feet of the bi-directional meter. In addition, the production meter socket, for residential installation, shall be a Milbank 125-Amp Ringless Single Phase (120/240) or equivalent Meter Socket.
Website
link
Phone
(435) 716-9700