MLEA - Moon Lake Electric Association SLC
Supply Side Taps Allowed1
Line Taps Allowed1
Load Taps Allowed1
Net metering & export
- Rebates Offered
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Supply Side Taps Allowed
- 1
- Line Taps Allowed
- 1
- Load Taps Allowed
- 1
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- Percentage
- Offset Value
- 120
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
- Offset Calc Tool
- N/A
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
- No specific requirements, MLED would rather see equipment specs than Site Plan
- SLD Reqs
- PV Panels -> Inverter -> Disconnect -> MSP -> MLED Meter
No specific requirements, MLED would rather see equipment specs than One Line
Line and Load Side Taps Allowed
Supply-Side Taps NOT Allowed
AC Disconnect:
Customer must provide a visible Isolation Switch for the Customer-owned Generation System that meets applicable ANSI For a 6000 Inverter please use a 40A 2P Breaker. There is a shortage of 35A Breakers - 11.23.20
- Electric Service Reqs
- Moon Lake does not have an offset restriction where they will decline or system offset, but for Net Metering, they do limit the production to 120%
Net Metering Program shall be available to Cooperatives Customers until the combination of all Customer-owned Generation Systems under the Net Metering Program will exceed 120 kW or until Cooperative limits interconnections to a prescribed amount of kW in excess of 120 kW.**Taps:**
- Placards
- AC Disconnect:
Isolation Switch must be permanently and visibly marked as GENERATOR ISOLATION in letters at least 2" high.
If the Isolation Switch is not adjacent to the electrical service entrance equipment, a permanent/weather resistant map shall be installed at that location detailing where the Isolation Switch is located.
- Website
- link
- Phone
- (435) 722-5400
Other details
- Restrict Inspection
- 0
- Address ID
- 112095
- Express Planset Eligible
- Yes