Price City Municipal

Utah Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeMonthly
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
1
NEM Type
Monthly
Post Solar Billing Method
Net Metering
Net Excess Generation Notes
We take the difference between was received and delivered and give them a one to one credit so every kilowatt they produce is equal to a kilowatt hour that they use. On the other hand in the trade off we don't allow credits to rollover month to month and what it does is basically lower the electric portion of their bill because we also bill their garbage and sewer. It will lower the electric portion of their bill down to the minimum charge each month.
Rebates Offered
0
Deregulated
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
1

System size & offset

System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes
We do state the limits of 1000 kW or 50% of the premise electrical service overcurrent device rating, whichever is lower.

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Meter Spot Process
Temporary Disconnect Reconnect Process (TDR) We require that a request be submitted to our Electric Department a minimum of 3 business days prior to when the disconnect reconnect needs to take place. The Electric department submits a work order to the lines and services contractor who will then perform the disconnect/reconnect at the scheduled time and date or call and schedule a different time if they have conflicts. We do require that someone be on-site during the disconnect/reconnect events.
TDR - Who to
TDR - ETA of notice required for request 3 business days
Transformer upgrades have not yet become common however may be necessary depending on the installation. We do have engineering done for installations to ensure that the system and components are capable of handling the load.
Allowed Meter Adapter
None

Plans & docs

Equipment Approvals
California Energy Commission
Rate Schedule Link
link
Website
link

Other details

Restrict Inspection
0
Address ID
622282
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Price City Municipal before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.