SESD - South Utah Valley Electric Service District

Utah Utility Interconnection & net metering rules

Spot something wrong?

Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.

Report a correction
Net Metering AllowedNo
Supply Side Taps AllowedNo
Line Taps AllowedNo
Load Taps AllowedNo

Net metering & export

Net Metering Allowed
No
Post Solar Billing Method
Export Rate
Solar Export Type
Fixed kWh
Solar Export Rate
0.051
Solar Export Value Notes
Rate changes from time to time.
Net Excess Generation Notes

NET FEED-IN TARIFF (NFiT): The customer consumes the electricity that is generated on the customer’s premises. Electricity supplied by the District is charged at the rates and fees listed below. Electricity generated by an eligible customer-operated renewable energy generator and fed back to the District’s electrical distribution grid is credited back to the customer’s kWh usage only at the NFiT rate listed below. 

Rebates Offered
No

Interconnection & taps

Approval Req To Install
Yes
Supply Side Taps Allowed
No
Line Taps Allowed
No
Load Taps Allowed
No
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
No

System size & offset

System Size Restrictions
10
System Size Restriction Type
AC kW
System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

System Size: Limit at 10kW AC

Offset Calc Tool
N/A

Metering & disconnect

Allowed Meter Adapter
None

Plans & docs

SLD Reqs

Production Meter not required

For a 6000 Inverter please use a 40A 2P Breaker. There is a shortage of 35A Breakers - 11.23.20

Electric Service Reqs

Taps:

Supply and Line side taps are not allowed

Load Side taps are allowed

Label Page Notes

Reference Utah Labels block

Rate Schedule Link
link
Website
link
Phone
(801) 465-8020

Other details

Revision Required
Yes
Mod Swap Requires Planset
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with SESD - South Utah Valley Electric Service District before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.