Spanish Fork City - Power and Light Department
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Annual
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
The kWhs you produce are used to offset the kWh, the customer consume before billed on the net kWhs. Excess energy will carry over from month to month until the solar season resets in Feb. Any credit at this point will be forfeited.
- Rebates Offered
- 0
Interconnection & taps
- Approval Req To Install
- No
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 25
- System Size Restriction Type
- DC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
Up to 25 kW
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- Yes
- Production Meter Position
- Inv-Disco-PM-POI
- Production Meter Labeling
- Production Meter
- AC Disconnect Required
- Yes
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
Site Plan not required for utility submittal
- SLD Reqs
PV Panels -> Inverter -> AC Disconnect -> Production Meter -> Main Service Panel -> Utility Meter (Production Meter is Required)
One Line Diagram Requirements
Generator - PV Panels - Include manufacturer, part number, nameplate maximum capacity (kW), physical location of panels.
Inverter - Manufacturer, type or series, part number, serial number, nameplate maximum capacity (kW), output voltage. physical location.
Disconnect Switch - Include physical location relative to the Spanish Fork City Power Service Meter.
Electrical Service Panel - Panel or Main Breaker size and the position at which the generation is connected. Show all panels (if there are multiple panels or subpanels) -- even if not directly connected into the generation system.
Spanish Fork City Power Service Meter - Include existing meter serial number, meter form, and class.
Other related Equipment - (battery banks, transfer or bypass switches, back up generators, etc.)
Must provide a written description of how the protection devices will achieve compliance with the requirements of this policy as part of the License Application
For a 6000 Inverter please use a 40A 2P Breaker. There is a shortage of 35A Breakers - 11.23.20
- Electric Service Reqs
PRODUCTION METER:
A separate meter may be installed to measure production of the renewable generation source. Customer shall pay for any non-standard meter electrical hook-up requested by the Customer.
AC DISCONNECT:
Customer shall furnish and install on the customer’s side of the meter, a UL approved safety disconnect switch which shall be capable of fully disconnecting the Customer’s generating facility from Spanish Fork City Power’s electric system.
The disconnect switch shall be located adjacent to Spanish Fork City Power’s meters and shall be of the visible break type in a metal enclosure that can be secured by a padlock.
The disconnect switch shall be accessible to Spanish Fork City Power personnel at all times
System Sizing:
Generating capacity of not more than twenty-five kilowatts (25 kW) aggregated at the service interconnection point
- Electrical Diagram Notes
(N) EATON B-LINE 011 METER SOCKET 125A 4 JAW 1PH NEMA 3R FORM 2S TOP FEED PV PRODUCTION METER
- Rate Schedule Link
- link
- Website
- link
- Phone
- (801) 804-4500
Other details
- Restrict Inspection
- 0
- Revision Required
- 1
- Mod Swap Requires Planset
- 1
- Address ID
- 108124
- Express Planset Eligible
- No