Springville Power

Utah Utility Interconnection & net metering rules
Net Metering Allowed1
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
1
Post Solar Billing Method
Net Metering
Rebates Offered
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2

Metering & disconnect

Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs

Refer to sample site diagram

SLD Reqs

Call out utility meter as "Springville City Power Service Meter"

For modular systems (e.g. pv panels), include:

Manufacturer, part number, nameplate maximum capacity (kW), and physical location.

Number of modules, configuration, nameplate maximum capacity of each module, and total nameplate maximum capacity.

Inverter - Include manufacturer, type or series, part number, serial number, nameplate maximum capacity (kW), output voltage, physical location.

Disconnect Switch - Include the physical location relative to the Springville City Power Service Meter.

Electrical Service Panel -Include the panel or main breaker size and the position at which the generation is connected. Show all panels (if there are multiple panels or subpanels) even if not directly connected into the generation system.

Springville City Power’s Service Meter - Placement and whether single phase or 3 phase meter.

Other Related Equipment (battery banks, transfer or bypass switches, backup generators, etc.) These items are typically associated with more custom and complex systems. Providing accurate information and connection diagrams is especially important as these systems are not as “routine”.

For a 6000 Inverter please use a 40A 2P Breaker. There is a shortage of 35A Breakers - 11.23.20

Electric Service Reqs

AC Disconnect:

Customer shall furnish and install on customer’s side of the meter, a UL approved safety disconnect switch which shall be capable of fully disconnecting the Customer’s generating facility from Springville City Power’s electric system. The disconnect switch shall be located adjacent to the Springville City Power’s meters and shall be of the visible break type in a metal enclosure which can be secured by a padlock. The disconnect switch shall be accessible to Springville City Power personnel at all times.

PRODUCTION METER REQUIRED:

Additional production meter base must be installed adjacent to the utility meter base and knives disconnect for the purpose of gathering research data. Springville City Power to install production meter

UL Listings:

All Customer-Owned Generation Equipment shall be in compliance with Underwriters Laboratories, Standards for Static Inverters and Charge Controllers for Use in Photovoltaic Systems; Standards for Safety: Flat-Plate Photovoltaic Modules and Panels; and IEEE, Recommended Practices for Qualification of Photovoltaic (PV) Modules; and the solar system shall be installed in compliance with IEEE Standards, Recommended Practice for Utility Interface of Photovoltaic.

Placards

Meter and transformer or transformer pole serving the Customer-Generator shall be labeled to indicate potential electric current back feed. Springville City Power will provide and install labels when Customer Generator’s electric system is approved for interconnection.


Customer’s over-current device at the service panel shall be marked to indicate power source and connection to the Springville City Power’s distribution system.

Label Page Notes

Reference Utah Labels block

Rate Schedule Link
link
Website
link
Phone
801-489-2750

Other details

Restrict Inspection
0
Revision Required
1
Mod Swap Requires Planset
1
Address ID
108139
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Springville Power before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.