APCo - Appalachian Power (WV)

Virginia Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeAnnual
Line Taps Allowed1
Load Taps Allowed1
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
1
NEM Type
Annual
TOU Utility
1
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

The electric utility shall credit a Customer-generator at the full retail rate, or the net metering credit approved by the Commission in a general rate filing, for each kW hour produced by an alternative or renewable energy resource installed on the Customer-generator side of the electric meter and delivered to the electric utility’s distribution system through the Customer-generator’s electric meter, up to the total amount of electricity delivered by the electric utility to that Customer-generator during the billing period.

Rebates Offered
0
Deregulated
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
1
Load Taps Allowed
1
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
1

System size & offset

System Size Restrictions
25
System Size Restriction Type
AC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

The capacity of any generator is further limited to an annual energy output no greater than the customer's previous 12 months' electrical energy consumption

Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
Yes
Production Meter Position
Inv-Disco-PM-POI
Production Meter Labeling
Production Meter
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect
Meter Spot Process

** This is required on every project for the utility to provide the PM Socket equipment. Must be done in conjunction with the installation **

B. Installer contacts the AEP Contact Center at to:

  • 1. Place a disconnect/reconnect order and receives two work order numbers and list of locations to pick up meter
  • 2. If no disconnect/reconnect is needed, contact the to receive a work order

C. AEP contacts installer to schedule date/time for disconnect/reconnect

D. Installer takes the work request number to a preapproved hardware store to pick-up meter base

E. Installer begins installation of system

F. AEP performs the disconnect at the scheduled disconnect time

G. Installer performs electrical work

H. Local Electrical Inspector performs inspection

I. AEP performs the reconnect and puts cover on the meter base at the scheduled time

Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs

See Site Plan Sample

SLD Reqs
  • See SLD Sample
  • Production meter REQUIRED
  • The system needs to have one single point of disconnect that will be able to shut down the entire system, including batteries
  • Equipment cannot run directly into the main meter

Battery

  • System needs to have one single point of disconnect that will be able to shut down entire system, including batteries.

Existing Systems

  • System may only have one single point of disconnect, existing systems will need to be combined before the POI.
Electrical Stamp Required
0
Equipment Approvals
California Energy Commission
Website
link
Phone
(800) 956-4237

Other details

Restrict Inspection
0
Revision Required
1
Mod Swap Requires Planset
1
Address ID
629488
Express Planset Eligible
Yes