APCo - Appalachian Power (WV)
Spot something wrong?
Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.
Report a correctionNet metering & export
- Net Metering Allowed
- Yes
- NEM Type
- Annual
- TOU Utility
- Yes
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
The electric utility shall credit a Customer-generator at the full retail rate, or the net metering credit approved by the Commission in a general rate filing, for each kW hour produced by an alternative or renewable energy resource installed on the Customer-generator side of the electric meter and delivered to the electric utility’s distribution system through the Customer-generator’s electric meter, up to the total amount of electricity delivered by the electric utility to that Customer-generator during the billing period.
- Rebates Offered
- No
- Deregulated
- No
Interconnection & taps
- Approval Req To Install
- Yes
- Line Taps Allowed
- Yes
- Load Taps Allowed
- Yes
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- Yes
System size & offset
- System Size Restrictions
- 25
- System Size Restriction Type
- AC kW
- System Size Battery Included
- No
- System Size Includes Existing Systems
- No
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
The capacity of any generator is further limited to an annual energy output no greater than the customer's previous 12 months' electrical energy consumption
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- Yes
- Production Meter Position
- Inv-Disco-PM-POI
- Production Meter Labeling
- Production Meter
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Allowed Meter Adapter
- None
Plans & docs
- SLD Reqs
- Production meter REQUIRED
- The system needs to have one single point of disconnect that will be able to shut down the entire system, including batteries
- Equipment cannot run directly into the main meter
Battery
- System needs to have one single point of disconnect that will be able to shut down entire system, including batteries.
Existing Systems
- System may only have one single point of disconnect, existing systems will need to be combined before the POI.
- Electrical Stamp Required
- No
- Equipment Approvals
- California Energy Commission
- Website
- link
- Phone
- (800) 956-4237
Other details
- Revision Required
- Yes
- Mod Swap Requires Planset
- Yes