Report a correctionNet metering & export
- Net Metering Allowed
- Yes
- NEM Type
- Annual
- TOU Utility
- No
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
For any billing period in which generation exceeds consumption, producing a billing period credit, the monthly charge shall be based only on the fixed charges of the customer’s standard tariff, and any charges that may be applicable per: (i) an excess facilities agreement and, (ii) a Commission-approved standby charge. Billing period credits will be carried forward and applied to offset future consumption charges as provided in Rule 20 VAC 5-315-50
A net metering customer shall receive no compensation for excess generation unless the net metering customer has entered into a power purchase agreement with the Cooperative
- Rebates Offered
- No
Interconnection & taps
- Approval Req To Install
- Yes
- Line Taps Allowed
- No
- Load Taps Allowed
- No
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- Yes
System size & offset
- System Size Restrictions
- 20
- System Size Restriction Type
- AC kW
- System Size Battery Included
- No
- System Size Includes Existing Systems
- No
- Offset Type
- Combination
- Offset Value
- 100
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
- System Offset Notes
- The utility has a very strict 100% offset limit
- Residential customers cannot be sized over 20.00 kW AC
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
- AC Disconnect must be accessible to the utility 24/7
- AC Disconnect must be lockable and load-bearing
- SLD Reqs
- AC Disconnect must be lockable and load-bearing
- Website