City of Franklin (Franklin Municipal Power & Light)
Spot something wrong?
Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.
Report a correction Net Metering AllowedNo
Line Taps AllowedNo
Load Taps AllowedNo
Net metering & export
- Net Metering Allowed
- No
- TOU Utility
- No
- Post Solar Billing Method
- Export Rate
- Solar Export Type
- Avoided Cost
- Net Excess Generation Notes
If the generation produced by the customer exceeds what the utility delivered to the customer during a billing cycle, the excess generation will be netted against the energy consumed by the customer at a rate equal to the avoided cost of energy. Credits will be carried forward month to month.
- Rebates Offered
- Yes
- Deregulated
- No
Interconnection & taps
- Approval Req To Install
- Yes
- Line Taps Allowed
- No
- Load Taps Allowed
- No
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- No
- System Size Includes Existing Systems
- No
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
Plans & docs
- Electrical Stamp Required
- No
- Website
- link
Other details
- Revision Required
- Yes
- Mod Swap Requires Planset
- Yes