Harrisonburg Electric
Spot something wrong?
Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.
Report a correction Net Metering AllowedYes
NEM TypeMonthly
Supply Side Taps AllowedYes
Line Taps AllowedYes
Load Taps AllowedYes
AC Disconnect RequiredYes
Net metering & export
- Net Metering Allowed
- Yes
- NEM Type
- Monthly
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
- HEC continues to credit excess energy from solar installations at the same rate as the customer purchases from HEC as long as the customer is generating less than 100% of their annual usage.
- Customers that wish to generate over 100% of their annual usage, up to 200%, may also enter into a net metering agreement, however, the excess energy generated over 100% will be credited at HEC’s avoided cost of wholesale power.
- Rebates Offered
- Yes
- Deregulated
- No
Interconnection & taps
- Approval Req To Install
- No
- Supply Side Taps Allowed
- Yes
- Line Taps Allowed
- Yes
- Load Taps Allowed
- Yes
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 20
- System Size Restriction Type
- AC kW
- System Size Battery Included
- No
- System Size Includes Existing Systems
- No
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
On residential systems if you size over 100% then the customer will need to go on our other agreement where any generation over 100% would be credited to the account at an avoided cost rate instead of the retail rate.
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- No
- AC Disconnect Required
- Yes
- Allowed Meter Adapter
- None
Plans & docs
- SLD Reqs
At the least the number of panels and inverters with their respective sizes. We also need to know if you are tying into a breaker in the panel or making a supply side tap.
- Install Reqs
HEC requires a manual, lockable, load break utility-interface disconnect switch between the output of the photovoltaic inverter and the Customer’s wiring connected to HEC’s electric distribution system.
- Equipment Approvals
- California Energy Commission
- Website
- link
- Phone
- (540) 217-2234
Other details
- Revision Required
- No
- Mod Swap Requires Planset
- Yes