Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

Mecklenburg Electric Coop

Virginia Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeAnnual
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
1
NEM Type
Annual
TOU Utility
0
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

For any billing period in which generation exceeds consumption, producing a billing period credit, the monthly charge shall be based only on the fixed charges of the customer’s standard tariff, and any charges that may be applicable per: (i) an excess facilities agreement and, (ii) a Commission-approved standby charge.

Billing period credits will be carried forward and applied to offset future consumption charges as provided in Rule 20 VAC 5-315-50. 

The customer shall receive no compensation for excess generation unless the customer has entered into a power purchase agreement with its supplier. [Customer is required to enter a PPA with the utility]

Rebates Offered
1

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
1

System size & offset

System Size Restrictions
20
System Size Restriction Type
AC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
Combination
Offset Value
100
Offset Calculation Basis
Historical
Offset Calculation Period
12
Industry Standard Watts Sqft
2
System Size Justification
Load Justification
System Offset Notes

Up to 100% of historic usage.

Hard limit at 20 kW AC

Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
No
AC Disconnect Required
Yes
Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs
  • AC Disconnect must be accessible to the utility 24/7
SLD Reqs
  • AC Disconnect required
Meter Num Req SLD 3LD
0
ESID Num Req SLD 3LD
0
Website
link
Phone
(800) 989-4161

Other details

Restrict Inspection
0
Mod Swap Requires Planset
1
Address ID
1255388
Express Planset Eligible
Yes