Mecklenburg Electric Coop

Virginia Utility Interconnection & net metering rules

Spot something wrong?

Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.

Report a correction
Net Metering AllowedYes
NEM TypeAnnual
Line Taps AllowedNo
Load Taps AllowedNo
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
Yes
NEM Type
Annual
TOU Utility
No
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

For any billing period in which generation exceeds consumption, producing a billing period credit, the monthly charge shall be based only on the fixed charges of the customer’s standard tariff, and any charges that may be applicable per: (i) an excess facilities agreement and, (ii) a Commission-approved standby charge.

Billing period credits will be carried forward and applied to offset future consumption charges as provided in Rule 20 VAC 5-315-50. 

The customer shall receive no compensation for excess generation unless the customer has entered into a power purchase agreement with its supplier. [Customer is required to enter a PPA with the utility]

Rebates Offered
Yes

Interconnection & taps

Approval Req To Install
Yes
Line Taps Allowed
No
Load Taps Allowed
No
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
Yes

System size & offset

System Size Restrictions
20
System Size Restriction Type
AC kW
System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Type
Combination
Offset Value
100
Offset Calculation Basis
Historical
Offset Calculation Period
12
Industry Standard Watts Sqft
2
System Size Justification
Load Justification
System Offset Notes

Up to 100% of historic usage.

Hard limit at 20 kW AC

Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
No
AC Disconnect Required
Yes
Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs
  • AC Disconnect must be accessible to the utility 24/7
SLD Reqs
  • AC Disconnect required
Meter Num Req SLD 3LD
No
ESID Num Req SLD 3LD
No
Website
link
Phone
(800) 989-4161

Other details

Mod Swap Requires Planset
Yes