Northern Neck Electric Coop
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Annual
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
The meter logs kilowatt hours whenever the member uses more electricity than is generated by the renewable fuel generation equipment. Conversely, the meter credits kilowatt hours on the same meter when the member generates electricity. The result is a month-ending meter reading that represents net use.
Cooperative, upon written request of the net metering customer, shall enter into an agreement to purchase excess generation for the requested net metering periods at a price equal to the simple average of the Cooperative’s hourly avoidable cost of energy.
Net metering customers own the RECs associated with their renewable fuel generators. A net metering customer wishing to sell its RECs to the Cooperative may do so by exercising a one-time only option, at the time it executes the power purchase agreement with the Cooperative, to include a provision requiring the purchase by the supplier of all generated RECs over the duration of the power purchase agreement.
- Rebates Offered
- 1
- Deregulated
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Supply Side Taps Allowed
- 0
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 20
- System Size Restriction Type
- AC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
- Offset Calc Tool
- PV Watts
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Meter Spot Required
- 1
- Meter Spot Process
Temporary Disconnect Reconnect Process (TDR)
- Reach out to the Northern Neck Electric Cooperative Member Services department for scheduling and associated fees for disconnect and reconnect services.
- Who to
- Who can schedule? Does not matter
- Allowed Meter Adapter
- None
Plans & docs
- SLD Reqs
- Electric Service Reqs
- Install Reqs
Utility Meter Socket
- Connect customer wires only to utility meter lugs.
- Do not install CTs or other instruments in the meter socket.
Utility Meter Seals
- Do not cut utility meter or meter base seals.
- If access is needed, schedule through NNEC Customer Service.
Connecting to Utility Meter Base Lugs
- If connecting conductors from a lockable disconnect to a second set of lugs in the meter base, schedule access through Customer Service.
Renewable Generator Capacity
- Must be less than the secondary and service entrance capacity.
- Must not overload the electric distribution transformer beyond manufacturer or nameplate ratings.
- Electrical Stamp Required
- 0
- Equipment Approvals
- California Energy Commission
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Rate Schedule Link
- link
- Website
- link
- Phone
- (804) 333-3621
Other details
- Restrict Inspection
- 0
- Mod Swap Requires Planset
- 1
- Address ID
- 661915
- Express Planset Eligible
- Yes