Rappahannock Electric Cooperative

Virginia Utility Interconnection & net metering rules

Spot something wrong?

Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.

Report a correction
Net Metering AllowedYes
NEM TypeAnnual
Supply Side Taps AllowedYes
Line Taps AllowedYes
Load Taps AllowedYes

Net metering & export

Net Metering Allowed
Yes
NEM Type
Annual
TOU Utility
Yes
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

"The meter will rotate forward to measure electricity being used from the grid, and it will reverse when the customer generates excess electricity (thereby “exporting” electricity to the electric grid). The sum, or ""net,"" of the forward and reverse rotation is the volume of electricity (kWh) to be billed or credited to the monthly bill.


Cooperative, upon written request of the net metering customer, shall enter into an agreement to purchase excess generation for the requested net metering periods at a price equal to the simple average of the Cooperative’s hourly avoidable cost of energy.


Net metering customers own the RECs associated with their renewable fuel generators. A net metering customer wishing to sell its RECs to the Cooperative may do so by exercising a one-time only option, at the time it executes the power purchase agreement with the Cooperative, to include a provision requiring the purchase by the supplier of all generated RECs over the duration of the power purchase agreement."

Rebates Offered
Yes
Deregulated
No
Allows Standby
Yes

Interconnection & taps

Approval Req To Install
Yes
Supply Side Taps Allowed
Yes
Line Taps Allowed
Yes
Load Taps Allowed
Yes
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
No

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Type
Percentage
Offset Value
100
Offset Calculation Basis
Historical
Offset Calculation Period
12
Industry Standard Watts Sqft
2
System Size Justification
Load Justification
System Offset Notes

100% OFFSET RESTRICTION. If the utility bill on file is more than 30 days old, a new one MUST be requested PRIOR to building the system.

Sizing is restricted to the customer's past 12 months usage. System cannot produce more what the member has consumed in the past 12 months.


For individual standard residential net metering applications, the maximum generator size is 20 kW. The state of Virginia allows REC members to install net metering capacity based on REC’s peak annual load and the threshold differs between residential, non-residential, or non-jurisdictional customer classes.

Offset Calc Tool
PV Watts

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

SLD Reqs

The entire design, also note REC requires there to be a handled AC Disconnect on the exterior of the property next to the utility meter.

Equipment Approvals
California Energy Commission
Website
link

Other details

Revision Required
No
Mod Swap Requires Planset
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Rappahannock Electric Cooperative before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.