Northfield Electric Dept
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Monthly
- TOU Utility
- 0
- Post Solar Billing Method
- Net Metering
- Rebates Offered
- 0
- Deregulated
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 1
- Load Taps Allowed
- 1
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 50
- System Size Restriction Type
- DC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
Up to 50kW
Metering & disconnect
- Production Meter Required
- Yes
- Production Meter Position
- Inv-PM-Disco-POI
- Production Meter Labeling
- Production Meter
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Meter Spot Process
TDR Process $100 per trip, if utility determines it is not able to be completed in one day, they will charge a second trip.
TDR - Who to
TDR - Applications/Documents Req No docs required
TDR - ETA of notice required for request No ETA required
TDR - Who can schedule? Does not matter
TDR - ETA of Utility Scheduling TDR No timeframe available, "case by case".
- Allowed Meter Adapter
- ConnectDER
Plans & docs
- SLD Reqs
Production meter required
Provide copies of One-Line Diagrams showing the generation facility equipment; this is required for all projects. Projects over 150 KW in size require the One-Line Diagrams to be signed and stamped by a licensed Electrical Engineer (PE).
- Install Reqs
The customer shall provide a lockable disconnect switch which meets NEC requirements and is accessible by first responders as per NEC requirements. This switch shall also be accessible by the Utility’s employees, and may be used to prevent parallel operation under certain circumstances. Contact your local utility as they may have additional requirements for the disconnect. The disconnect switch shall be clearly marked ‘Generator Disconnect Switch’ with permanent letters, a minimum of 3/8 inch high. The preferred location of the generator disconnect switch is that it be located outdoors within 10 feet of the Utility’s electric service meter. With your local utility’s approval, the generator disconnect switch may be located in some other accessible location, however in this circumstance, there shall be a placard placed at the service location giving directions to the location of the disconnect per NEC.
- Equipment Approvals
- California Energy Commission
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Website
- link
- Phone
- (802) 485-5411
Other details
- Restrict Inspection
- 0
- Address ID
- 282889
- Express Planset Eligible
- No