Vermont Electric Co-op

Vermont Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeMonthly
Line Taps Allowed1
Load Taps Allowed1
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
1
NEM Type
Monthly
TOU Utility
0
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

Blended residential rate, currently $.15417 per kilowatt-hour (kWh)

Credits will remain on account for 12 months to be applied to future bills. If a credit is not used within 12 months of the time it’s generated, it will expire.

Rebates Offered
0
Deregulated
0
Allows Standby
1

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
1
Load Taps Allowed
1
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
50
System Size Restriction Type
DC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

Up to 50kW

Offset Calc Tool
PV Watts

Metering & disconnect

Production Meter Required
Yes
Production Meter Position
Inv-PM-Disco-POI
Production Meter Labeling
Production Meter
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect
Meter Spot Process

VEC will install the production meter within 5 business days

TDR Process $220 per trip

TDR - Who to

TDR - Applications/Documents Req No docs required

TDR - ETA of notice required for request 7 days

TDR - Who can schedule? Does not matter

TDR - ETA of Utility Scheduling TDR 7 days

Allowed Meter Adapter
Tesla Backup Switch,ConnectDER

Plans & docs

Site Plan Reqs

A site plan is a construction drawing. All systems must provide a site plan or plans of the project containing the

following information:

a. The scale in feet and a representative fraction. The plan must be drawn to scale.

b. A compass orientation, legend, title and date.

c. An inset showing the location of the system within the Town.

d. Proposed facility location and any project features, including all described below. Indicate whether features

already existing or are proposed, (such as electric poles, access drives, etc.).

e. Property boundaries and setback distances from those boundaries to the corner of the nearest project related structure, Distances to any nearby residences, and dimensions of all proposed improvements.

f. The project limits of disturbance and the total acreage of any disturbed area, including any necessary and

associated distribution upgrades.

f. Proposed utilities, including the distance from source of power, sizes of service available and required, and

locations of any proposed utility or communication lines. Indicate whether utility lines are overhead or

underground.

g. A description of any areas where vegetation is to be cleared, altered, or mowed/managed during

construction or on an on-going basis during the operation of the facility.

h. A description of any proposed direct or indirect alterations to or impacts on wetlands or other natural

resources protected under 30 V.S.A. § 248(b)(5).

i. Detailed plans for any drainage of surface and/or sub-surface water and plans to control erosion and

sedimentation both during construction and as a permanent measure.

j. Locations and specific descriptions of proposed screening, landscaping, groundcover, fencing, exterior

lighting, and signs.

k. Plans of any proposed access driveway, roadway, or parking area at the project site, including grading,

drainage, and traveled width, as well as a cross-section of the access drive indicating the width, depth of

gravel, paving, or surface materials.

l. The latitude and longitude coordinates for the center of the proposed project.

m. The presence and total acreage of primary agricultural soils as defined in 10 V.S.A. § 6001 on each tract to

be physically disturbed in connection with the construction and operation of the net-metering system, the

amount of those soils to be disturbed, and any other proposed impacts to those soils.

n. The approved site plan from any Act 250 Land Use Permit applicable to the host parcel.

o. If not a preferred site, a description of the current site use. If in agricultural use, describe whether site is

pasture, hay crop, row crops, etc.

SLD Reqs

Production meter required

Provide copies of One-Line Diagrams showing the generation facility equipment; this is required for all projects. Projects over 150 KW in size require the One-Line Diagrams to be signed and stamped by a licensed Electrical Engineer (PE).

Equipment Approvals
California Energy Commission
Meter Num Req SLD 3LD
0
ESID Num Req SLD 3LD
0
Website
link
Phone
(802) 635-2331

Other details

Restrict Inspection
0
Address ID
206730
Express Planset Eligible
No
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Vermont Electric Co-op before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.