Avista Utilities (WA)
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Monthly
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
Any net excess generation (NEG) during a monthly billing period is credited to the customer's next bill at the utility's retail rate. At the beginning of each calendar year, any remaining NEG is granted to the utility with no compensation for the customer.
- Rebates Offered
- 0
- Deregulated
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 1
- Load Taps Allowed
- 1
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 1
System size & offset
- System Size Restrictions
- 100
- System Size Restriction Type
- AC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
Net metering limit is 100 kW.
The intent of Net Metering is to offset usage, any bank (overage of generation kwh) is reset annually on 3/31. There is no compensation for any generation lost during the reset.
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- No
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Meter Spot Process
TDR Process Work is performed Monday - Friday 7:00am - 3:30pm. We require a minimum of 2 business days notification, but not more than 2 weeks. Customer Service can schedule an appointment window for you. We only drop service if someone is on-site and available for work. Reconnects are also done during normal business hours. If work is being done on the electrical panel, the Serviceman will need to see proof of electrical permits before he drops the service. There is no cost for a service drop/reconnect. Customer Service can be reached at .
TDR - Who to Contact - Customer Service
TDR - Applications/Documents Req - N/A
TDR - ETA of notice required for request - 2 business days
TDR - Who can schedule? - Does not matter
TDR - ETA of Utility Scheduling TDR - N/A
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
- If possible, please install the the AC disco next to the utility meter (within 10 feet).
- If not possible, please ensure that the placard map is installed in the utility meter to show the location of the AC disconnect. (Please include the proposed Placard Map in the PV Plans)
- SLD Reqs
PM can be installed at customer request, but is not required.
- Placards
- Equipment Approvals
- California Energy Commission
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Website
- link
Other details
- Restrict Inspection
- 0
- Revision Required
- 1
- Mod Swap Requires Planset
- 1
- Address ID
- 283353
- Express Planset Eligible
- Yes