Benton PUD
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Annual
- TOU Utility
- 0
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
If the electricity generated by the Customer exceeds consumption and is distributed back to the PUD during the billing period, then the Customer shall be credited for the net excess kilowatt-hours generated during the billing period, with this kilowatt-hour credit appearing on Customer’s bill for the following billing period. Every year in March any remaining credits will be exhausted with no compensation to the member.
- Rebates Offered
- 0
- Deregulated
- 1
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- Percentage
- Offset Value
- 100
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- Yes
- Production Meter Criteria
Production meter is OPTIONAL
- Production meter base shall not be affixed to manufactured home or any temporary structure
- Production Meter Position
- Inv-Disco-PM-POI
- Production Meter Labeling
- Production Meter
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
Standard
- SLD Reqs
See SLD Example in files
- Electric Service Reqs
AC Disconnect Required
- Must be a UL listed AC disconnect switch
- Must be a visible break and in the lockable open position
- Must be located between the meter base and generating equipment
Production Meter Required (confirmed with utility 2/12/2024)
- Placards
Common labeling, at Interconnection Customer’s expense, furnished or approved by the Utility and in accordance with NEC requirements must be posted on meter base, disconnects, and transformers informing working personnel that a generating facility is operating at or is located on the premises.
- PRODUCTION METER: AC production meter base shall be labeled, "CUSTOMER GENERATOR, PRODUCTION METER", with engraved phenolic placards; 3/8" white capitalized lettering on a red background.
- Main electric service (Net Meter) meter base shall be labeled "NET METER, CUSTOMER GENERATOR CONNECTED TO THIS SERVICE", with engraved phenolic placards; 3/8" white capitalized lettering on a red background.
- When the production meter is not within line of sight of the net meter, an engraved placard showing both meter locations shall be installed next to the production meter.
- Electrical Stamp Required
- 0
- Equipment Approvals
- California Energy Commission
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Website
- link
- Phone
- (509) 582-1230
Other details
- Restrict Inspection
- 1
- Revision Required
- 1
- Mod Swap Requires Planset
- 1
- Address ID
- 4470592
- Express Planset Eligible
- No