City of Port Angeles
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Annual
- TOU Utility
- 0
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
If excess electricity generated by the net metering system during a billing period exceeds the electricity supplied by the electric utility during the same billing period, the customer-generator: Shall be billed for the appropriate customer charges for that billing period, in accordance with RCW 80.60.020; and Shall be credited for the excess kilowatt-hours generated during the billing period, with the credit for kilowatt-hours appearing on the bill for the following billing period.
- Rebates Offered
- 0
- Deregulated
- 0
- Allows Standby
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 100
- System Size Restriction Type
- AC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
Metering & disconnect
- Production Meter Required
- No
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Utility Disconnect Switch
Plans & docs
- Site Plan Reqs
Standard
- SLD Reqs
Standard
- Electric Service Reqs
All equipment must be installed to perform under the IEEE 1547 anti-islanding grid profile.
- Install Reqs
Follow the Washington State Building Code (most recent edition) and the NEC (most recent edition). All installations require permitting and inspection through the City.
Must have a dedicated lockable disconnect device between the sources of alternating-current or other power conditioning units and the city's distribution system. The disconnect must be accessible to the city at all times and only the citys lock may be used on it.
- Placards
Customers over current device at the service panel shall be marked to indicate power source and connection to the city's distribution system
- Equipment Approvals
- California Energy Commission
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Electrical Diagram Notes
All Jobs [All equipment must be installed to perform under the IEEE 1547 anti-islanding grid profile.]
- Rate Schedule Link
- link
- Website
- link
- Phone
- (360) 457-0411
Other details
- Restrict Inspection
- 0
- Revision Required
- 1
- Mod Swap Requires Planset
- 1
- Address ID
- 8572451
- Express Planset Eligible
- Yes