City of Port Angeles

Washington Utility Interconnection & net metering rules

Spot something wrong?

Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.

Report a correction
Net Metering AllowedYes
NEM TypeAnnual
Line Taps AllowedNo
Load Taps AllowedNo
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
Yes
NEM Type
Annual
TOU Utility
No
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

If excess electricity generated by the net metering system during a billing period exceeds the electricity supplied by the electric utility during the same billing period, the customer-generator: Shall be billed for the appropriate customer charges for that billing period, in accordance with RCW 80.60.020; and Shall be credited for the excess kilowatt-hours generated during the billing period, with the credit for kilowatt-hours appearing on the bill for the following billing period.

Rebates Offered
No
Deregulated
No
Allows Standby
No

Interconnection & taps

Approval Req To Install
Yes
Line Taps Allowed
No
Load Taps Allowed
No
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
100
System Size Restriction Type
AC kW
System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2

Metering & disconnect

Production Meter Required
No
AC Disconnect Required
Yes
AC Disconnect Labeling
Utility Disconnect Switch

Plans & docs

Site Plan Reqs

Standard

SLD Reqs

Standard

Electric Service Reqs

All equipment must be installed to perform under the IEEE 1547 anti-islanding grid profile.

Install Reqs

Follow the Washington State Building Code (most recent edition) and the NEC (most recent edition). All installations require permitting and inspection through the City.


Must have a dedicated lockable disconnect device between the sources of alternating-current or other power conditioning units and the city's distribution system. The disconnect must be accessible to the city at all times and only the citys lock may be used on it.

Placards

Customers over current device at the service panel shall be marked to indicate power source and connection to the city's distribution system

Equipment Approvals
California Energy Commission
Meter Num Req SLD 3LD
No
ESID Num Req SLD 3LD
No
Electrical Diagram Notes

All Jobs [All equipment must be installed to perform under the IEEE 1547 anti-islanding grid profile.]

Rate Schedule Link
link
Website
link
Phone
(360) 457-0411

Other details

Revision Required
Yes
Mod Swap Requires Planset
Yes