Grant PUD
Spot something wrong?
Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.
Report a correction Net Metering AllowedYes
NEM TypeAnnual
Line Taps AllowedNo
Load Taps AllowedNo
Net metering & export
- Net Metering Allowed
- Yes
- NEM Type
- Annual
- TOU Utility
- No
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
If you provide Grant PUD more energy than you use for the billing period, you are billed the minimum charge and any excess energy is “banked” for you for future use. Banked amounts can carry forward month to month but not year to year. Per State Law, this banked amount is eliminated March 31 of each year. We do not purchase customers' excess solar generation.
- Rebates Offered
- No
- Deregulated
- No
- Allows Standby
- No
Interconnection & taps
- Approval Req To Install
- Yes
- Line Taps Allowed
- No
- Load Taps Allowed
- No
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- No
System size & offset
- System Size Restrictions
- 100
- System Size Restriction Type
- AC kW
- System Size Battery Included
- No
- System Size Includes Existing Systems
- No
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
100% offset (not heavily enforced but highly preferred) or 100 kW AC, whichever is less. The utility does NOT purchase excess energy, and any excess energy after March 31 of each year will be eliminated.
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
Plans & docs
- Equipment Approvals
- California Energy Commission
- Rate Schedule Link
- link
- Website
- link
- Phone
- (509) 766-2512
Other details
- Revision Required
- Yes
- Mod Swap Requires Planset
- Yes