Inland Power & Light
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Annual
- TOU Utility
- 0
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
When a member generated more electricity than they use, the net electricity generated by the member will be credited to the account. On March 31 of each calendar year, any remaining unused kilowatt-hour credit accumulated by the member during the previous year (April 1 through March 31) will be granted to Inland, without compensation to the member
- Rebates Offered
- 0
- Deregulated
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Supply Side Taps Allowed
- 0
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 1
System size & offset
- System Size Restrictions
- 100
- System Size Restriction Type
- AC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
100 kW AC max
- Offset Calc Tool
- PV Watts
Metering & disconnect
- Production Meter Required
- Yes
- Production Meter Position
- Inv-Disco-PM-POI
- Production Meter Labeling
- Production Meter
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Meter Spot Process
See Net Metering Construction Example
TDR Process Notification to the utility at least 2 business days prior to when the disconnect is needed.
TDR - Who to Contact Member Service
TDR - Applications/Documents Req N/A
TDR - ETA of notice required for request 48 hours
TDR - Who can schedule? Does not matter
TDR - ETA of Utility Scheduling TDR N/A
- Allowed Meter Adapter
- None
Plans & docs
- SLD Reqs
See SLD Sample
- Electric Service Reqs
Depends on the system size and the process depends on that.
- Install Reqs
"You install the socket we provide the production meter. This is installed at the time of our inspection. There is a $350 fee Inland bills to our members for our inspection and the cost of the production meter.
Standard 2s meter socket"
- Equipment Approvals
- California Energy Commission
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Rate Schedule Link
- link
- Website
- link
- Phone
- (509) 789-4277
Other details
- Restrict Inspection
- 0
- Revision Required
- 1
- Mod Swap Requires Planset
- 1
- Address ID
- 285118
- Express Planset Eligible
- No