Puget Sound Energy

Washington Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeAnnual
Line Taps Allowed1
Load Taps Allowed1
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
1
NEM Type
Annual
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

If excess energy generated by the Net Metering System during a billing period exceeds the electricity supplied by the Company during the same billing period, the Customer-Generator will be credited for the excess kilowatt-hours generated during the billing period, making the kilowatt-hours available to offset electricity consumption during following bill periods.

Rebates Offered
0
Deregulated
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
1
Load Taps Allowed
1
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
1

System size & offset

System Size Restrictions
25
System Size Restriction Type
AC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
Combination
Offset Value
100
Offset Calculation Basis
Historical
Offset Calculation Period
12
Industry Standard Watts Sqft
2
Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
No
Production Meter Criteria
  • Production meters are optional (only if a customer request one to view system production and total home energy use)
  • If the customer opts for a production meter, it will need to be a single production meter, co-located with the net meter. No production meters for DC coupled battery backup systems or systems tied into sub panels on remote parts of the property.
Production Meter Position
N/A
Production Meter Labeling
N/A
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect
Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs

Not Required for Interconnection submittal

SLD Reqs

INCLUDE NOTE ON SLD NEAR METER ILLISTRATION INCLUDING

  • METER NUMBER (EXAMPLE X123456789)
  • RATING (CL200/320)
  • IF METER CAN IS CT RATED (CT RATED METER CAN)
Electric Service Reqs

Disconnect must be a single switch that isolates the entire system

Install Reqs

For projects with battery, please leave the system ON after system commissioning. Failure to do so will cause a failed utility inspection.

Placards
  • Meter enclosures shall be labeled with permanently affixed signage at the net metering enclosure to identify their function (i.e: net meter)
  • Where metering is accomplished at different voltages, the signage must also identify the voltages at which the meters are energized.
  • Labels shall confirm to the requirements of NEC Article 690.
  • All labeling should be capitalized. PSE requires engraved phenolic nameplates or adhesive die-cute labels at least 1 inch high, with raised or cut-out lettering that is a minimum of 3/8 inch high.
Equipment Approvals
California Energy Commission
Meter Num Req SLD 3LD
1
ESID Num Req SLD 3LD
0
Site Plan Notes

If current service is CT rated, include the CT enclosure on the schematic and site plan and include “Net Meter - Form 9S, CL20 13 terminal” at the Net Meter. Please also provide a photograph of of CT enclosure.

Electrical Diagram Notes

INCLUDE NOTE ON SLD NEAR METER

  • METER NUMBER (EXAMPLE X123456789)
  • RATING (CL200 OR 320) *FIND CORRECT RATING FROM SITE CAPTURE REPORT*

FOR PROJECTS EQUIPED WITH A CT RATED METER

  • INCLUDE NOTE ON SLD NEXT TO UM "CT RATED METER CAN"
  • ALL ELECTRICAL EQUIPMENT SHALL BE ILLISTRATED ON THE DIAGRAM (CT CAN, SERVICE METER, ALL PANELBOARDS)
  • LOCKABLE AC DISCONNECT SHALL BE LOCATED WITHIN LINE OF SITE TO THE METER
Rate Schedule Link
link
Website
link

Other details

Restrict Inspection
0
Revision Required
1
Mod Swap Requires Planset
1
Address ID
3797020
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Puget Sound Energy before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.