Tacoma Public Utility

Washington Utility Interconnection & net metering rules

Spot something wrong?

Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.

Report a correction
Net Metering AllowedYes
NEM TypeAnnual
Line Taps AllowedYes
Load Taps AllowedYes
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
Yes
NEM Type
Annual
TOU Utility
No
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

If the electricity generated by the Customer and distributed back to Tacoma Power during the billing period exceeds the electricity supplied then the Customer shall be Credited for the net excess kilowatt-hours generated during the billing period, with this kilowatt-hour credit appearing on Customer’s bill for the following billing period. (This is credited at the retail rate of $ $0.045351). On March 31 of each calendar year, any remaining unused kilowatt-hour credit accumulated by the Customer during the previous year shall be granted to Tacoma Power, without any compensation to the Customer.

Rebates Offered
No
Deregulated
Yes

Interconnection & taps

Approval Req To Install
Yes
Line Taps Allowed
Yes
Load Taps Allowed
Yes
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
Yes

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Type
Percentage
Offset Value
100
Offset Calculation Basis
Historical
Offset Calculation Period
12
Industry Standard Watts Sqft
2
Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
No
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect
Allowed Meter Adapter
None,Tesla Backup Switch

Plans & docs

Site Plan Reqs

Standard

SLD Reqs


Electric Service Reqs

AC Disconnect Required

  • Disconnect shall be within sight of the Meter and accessible to Tacoma Power personnel at all times

Backup Switch

  • Cannot install Backup Switch on Ringless Meter Enclosures
Placards
  • The Billing Meter and Safety Disconnect shall be permanently labeled as such. Labels must be of sufficient durability to withstand removal from rubbing, fading, or environmental exposure.
Electrical Stamp Required
No
Equipment Approvals
California Energy Commission
Meter Num Req SLD 3LD
No
ESID Num Req SLD 3LD
No
Label Page Notes

2020 NEC

Website
link

Other details

Revision Required
Yes
Mod Swap Requires Planset
Yes