Central Wisconsin Elec Coop

Wisconsin Utility Interconnection & net metering rules
Net Metering Allowed0
NEM TypeN/A
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
0
NEM Type
N/A
Post Solar Billing Method
Export Rate
Solar Export Type
Avoided Cost
Solar Export Rate Approx
0.04016
Solar Export Value Notes
Rates subject to change yearly
Net Excess Generation Notes

CWEC will furnish, install and maintain watt-hour meter(s) equipped to measure energy flow in and out of the member’s distributed generation location. This meter will have the ability to record the energy generated by the member that is supplied to the Cooperative’s distribution system if the ember generates excess energy. Excess energy supplied to the Cooperative’s distribution system will be purchased by the Cooperative at the Cooperative’s unbundled energy rate.


CWEC utilizes an “Avoided Cost” compensation structure for excess kWh produced and not consumed within your residence.

Rebates Offered
0
Deregulated
0
Allows Standby
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2

Metering & disconnect

Production Meter Required
Yes
Production Meter Position
N/A

Plans & docs

SLD Reqs

"The production meter can be on either side of the Utility AC Disconnect switch. Our preference is to have it on the solar side of the AC Disconnect since it is part of the solar system."

Equipment Approvals
California Energy Commission
Website
link
Phone
(715) 677-2211

Other details

Restrict Inspection
0
Revision Required
1
Mod Swap Requires Planset
1
Address ID
13940029
Express Planset Eligible
No
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Central Wisconsin Elec Coop before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.