Report a correction Net Metering AllowedYes
NEM TypeMonthly
Line Taps AllowedNo
Load Taps AllowedNo
Net metering & export
- Net Metering Allowed
- Yes
- NEM Type
- Monthly
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
For energy, kWhrs, delivered up to the number of kWhrs purchased for the month the Cooperative will pay the customer:
Energy Charge per kWhr:
*Summer -$.1331
**Winter -$.1158
For energy, kWhrs, delivered in excess of the number of kWhrs purchased for the month the Cooperative will pay the customer at the avoided cost rate
- Rebates Offered
- No
Interconnection & taps
- Line Taps Allowed
- No
- Load Taps Allowed
- No
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Battery Included
- No
- System Size Includes Existing Systems
- No
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A