Net Metering AllowedYes
NEM TypeMonthly
Line Taps AllowedNo
Load Taps AllowedNo
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
Yes
NEM Type
Monthly
TOU Utility
No
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

Systems sized 0 to 20 kW are net metered and trued up monthly. The co-op looks at how many kWhs were purchased by the member and how many kWhs were sold to the cooperative and trues up at the end of the month. If any excess energy is sold to the cooperative, the cooperative pays avoided costs for that excess. Avoided cost is the same rate as the cooperative can purchase energy on the market. The average avoided cost comes from our G&T power provider, Dairyland Power Cooperative. This rate varies every month and will be adjusted monthly. The rate averages $.03/kWh

Rebates Offered
No
Deregulated
No
Allows Standby
No

Interconnection & taps

Approval Req To Install
Yes
Line Taps Allowed
No
Load Taps Allowed
No
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
No

System size & offset

System Size Restrictions
20
System Size Restriction Type
AC kW
System Size Battery Included
Yes
System Size Includes Existing Systems
Yes
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
Inverter Oversize Restrictions
No

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect

Plans & docs

Equipment Approvals
California Energy Commission
Meter Num Req SLD 3LD
No
ESID Num Req SLD 3LD
No
Rate Schedule Link
link
Website
link
Phone
(800) 421-0283

Other details

Revision Required
Yes
Mod Swap Requires Planset
Yes