Net Metering AllowedYes
NEM TypeMonthly
Line Taps AllowedNo
Load Taps AllowedNo

Net metering & export

Net Metering Allowed
Yes
NEM Type
Monthly
TOU Utility
No
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

All excess energy will be purchased by SREC at avoided cost. The regular electric meter will be replaced with a bi-directional meter that measures energy sales to the member and also any excess energy flowing backwards through the meter that is put back on the grid. Each month the member will be credited on their monthly billing for the excess energy. Once a year in the month of June any credit over $100.00 will be paid back by check to the member.

Rebates Offered
Yes
Deregulated
No

Interconnection & taps

Approval Req To Install
No
Line Taps Allowed
No
Load Taps Allowed
No
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
No

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Type
Percentage
Offset Value
100
Offset Calculation Basis
Historical
Offset Calculation Period
12
Industry Standard Watts Sqft
2
Offset Calc Tool
Historical Usage

Metering & disconnect

Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs
  • Must show location of main disconnect. All systems must be installed after the main fused disconnect.
SLD Reqs
  • Standard
Electric Service Reqs
  • Lockable load-break disconnect switch must be installed between the DG facility and the cooperatives lines.
  • Only one meter (utility meter) is required for NEM. Production meter is not required unless the customer is wanting to participate in buy-all sell-all (this will NOT be standard)
Electrical Stamp Required
No
Equipment Approvals
California Energy Commission
Website
link

Other details

Revision Required
Yes
Mod Swap Requires Planset