Sturgeon Bay Utilities
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Monthly
- TOU Utility
- 0
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
• Parallel Generation (20 kW or less)
The customer shall be billed monthly on a net energy basis and shall pay the fixed charge and energy charge specified in the rate schedule under which he is served. If, in any month, the customer’s bill has a credit balance of $25 or less, the amount shall be credited to subsequent bills until a debit balance is reestablished. If the credit balance is more than $25, the utility shall reimburse the customer by check upon request. Monthly credits shall be computed by taking the net excess kilowatt-hours produced times the sum of the applicable energy charge plus monthly power cost adjustment clause (PCAC).
• Customer-Owned Generation Systems (Greater than 20 kW)
Customers shall receive monthly payments for all electricity delivered to the utility and shall be billed by the utility for metering and associated billing expenses specified in the latest rates of the wholesale supplier unless the latest rates of the wholesale supplier do not properly reflect avoided costs. In such event, the Commission, upon request, may determine appropriate rates. The utility shall have on file a copy of the latest customer-owned generation system rates for its wholesale supplier. Customers with generation systems greater than 20 kW and less than or equal to 100 kW have the right to negotiate a buy-back rate. The buy-back rate cannot be greater than the full avoided cost.
- Rebates Offered
- 1
- Deregulated
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Utility Disconnect Switch
- Allowed Meter Adapter
- Tesla Backup Switch
Plans & docs
- Site Plan Reqs
Must show the following:
- Street address of DG facility
- Adjoining street name
- Electric service entrance
- Electric meter
- Interface equipment
- Location of major equipment
- Location of interconnect disconnect switch (if required)
- System must be installed within 135 degrees of due south
- Must be installed with a panel tilt between 5-50 degrees
- Must have less than 15 percent obstacle shading based on analysis of an industry-accepted tool
- SLD Reqs
Must show the following:
- Generator or inverter
- Point where DG facility is electrically connected to the customer’s electrical system
- Point of common coupling
- Lockable interconnection disconnect switch (outside, if required)
- Method of grounding, including generator and transformer ground connections
- Protection function and systems
- Website
- link
- Phone
- (920) 746-2820
Other details
- Restrict Inspection
- 0
- Revision Required
- 0
- Mod Swap Requires Planset
- 1
- Address ID
- 167985
- Express Planset Eligible
- Yes