Vanguard Electric
Spot something wrong?
Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.
Report a correction Net Metering AllowedYes
Line Taps AllowedNo
Load Taps AllowedNo
AC Disconnect RequiredYes
Net metering & export
- Net Metering Allowed
- Yes
- TOU Utility
- No
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
Per Utility "We install bi-directional meters, and payback is currently at the retail rate."
- Rebates Offered
- No
- Deregulated
- Yes
Interconnection & taps
- Approval Req To Install
- No
- Line Taps Allowed
- No
- Load Taps Allowed
- No
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- No
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- No
- System Size Includes Existing Systems
- No
- Offset Type
- Percentage
- Offset Value
- 100
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
Standard
- SLD Reqs
Standard
- Electric Service Reqs
AC Disconnect Required
- Placards
AC Disconnect Required
- if the disconnect switch will not be located within 10 feet of the meter, a placard must be installed on the meter socket indicating the location of the switch and distance in feet from the meter.
- Electrical Stamp Required
- No
- Equipment Approvals
- California Energy Commission
- Meter Num Req SLD 3LD
- No
- ESID Num Req SLD 3LD
- No
- Website
- link
- Phone
- (608) 767-2561