Vernon Electric Cooperative (WI)
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Monthly
- TOU Utility
- 0
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
20kW AC or Less: When the energy produced exceeds energy consumed for the billing month, the member shall be credited for the excess energy volumes at the per following kWh rates: June, July, & August @6.63¢ per kWh September - May @ 3.17¢ per kWh. Excess generation will be credited against any amounts owed on a monthly basis and refunds on credits owed to the member will be done on an annual basis or when the credit amount is more than $500
Greater than 20kW AC: Renewable systems of 20kW AC and more, the cooperative shall install metering capable of measuring inflow and outflows of energy from member in real time. Excess generation delivered to the cooperative will be credited at the cooperatives avoided cost rate, avoided cost which ranges from 2.75 - 3.75 cents / kWh
- Rebates Offered
- 1
- Deregulated
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- Percentage
- Offset Value
- 100
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
Metering & disconnect
- Production Meter Required
- No
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
Standard
- SLD Reqs
Standard - See example diagram uploaded to files
Must include:
- Inverter
- Point of Interconnection
- Lockable disconnect switch
- Grounding Method
- Protection of functions and systems
- Electric Service Reqs
AC Disconnect required
- Placards
AC Disconnect must be labeled "Interconnection Disconnect Switch"
- Must be permanently attached
- Clearly visible and permanent letters
- Equipment Approvals
- California Energy Commission
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Website
- link
Other details
- Restrict Inspection
- 0
- Address ID
- 3387321
- Express Planset Eligible
- Yes