BVEA - Bridger Valley Electric Association

Wyoming Utility Interconnection & net metering rules

Spot something wrong?

Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.

Report a correction
Line Taps AllowedNo
Load Taps AllowedNo

Net metering & export

Rebates Offered
No

Interconnection & taps

Approval Req To Install
Yes
Line Taps Allowed
No
Load Taps Allowed
No
Automatic Transformer Upgrade Size
0

System size & offset

System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

must not exceed 25 kW of capacity

Offset Calc Tool
N/A

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

SLD Reqs

For a 6000 Inverter please use a 40A 2P Breaker. There is a shortage of 35A Breakers - 11.23.20

Electric Service Reqs

Stand-alone meters must receive an MPU in Utah

Net Metering Requirements _(M Net Metering Rate)_:

A generating facility that is not interconnected to the load side of the member/owner’s said metered point of delivery for electric service shall not be applicable for Net Metering. This schedule is offered in compliance with Wyoming Statutes 37-16-101 thru 104

AC Disconnect

Safety switch shall be located adjacent to BVEA's meters and must be visible break type in a metal enclosure that can be secured by a padlock.

Phone
(307) 786-2800
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with BVEA - Bridger Valley Electric Association before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.